Purchasing a tool from three thousand kilometres away and from thirty kilometres away are different problems, and the difference is lead time. Treat it as a price and the arithmetic becomes simple: a cheaper tool with a six week pipeline needs a buffer, and the buffer has a cost. Plan for it properly and the same tool delivers the price advantage without the risk of a cast house standing still.
What the timeline actually contains
- Production: often the shortest part. Standard geometries can ship from finished stock, while a custom drawing typically needs a short tooling and machining window.
- Inland and port: a few days to a week from factory to vessel.
- Ocean freight: the dominant block on long routes, measured in weeks.
- Clearance and delivery: normally days, but longer if documentation is incomplete – which is why the paperwork in the export packing guide is a schedule subject, not a formality.
The cost of the buffer, and the cost of no buffer
Holding six to eight weeks of consumption costs working capital, storage space and a little obsolescence risk. Running out costs a cast. For a two furnace plant drilling twelve casts a day, one lost cast is worth more than a year of storage for the entire tool set. The comparison is not close, and it is the reason a stock policy belongs in the same document as the price agreement.
Five planning rules that work
- Order by consumption, not by calendar. If you know your hole count, you know your monthly usage – see the consumable volume arithmetic.
- Split the annual volume. Two or three shipments a year keep freight per tonne down and release the buffer gradually.
- Keep one spare string per machine. Rods, adapters and connectors, not just bits. The part that stops a machine is rarely the part you stocked.
- Use air freight deliberately. Reserve it for genuine emergencies and price it into the annual plan rather than discovering it in a crisis.
- Qualify a second supplier. One source plus one ocean route is a single point of failure, whatever the price.
How a supplier can shorten the pipeline
Distance is fixed; the rest of the timeline is not. A supplier who keeps semi-finished stock for common rod profiles and can machine to drawing after the enquiry cuts weeks out of production. A supplier who quotes a realistic ship date, consolidates mixed orders into one shipment and prepares documents correctly removes days at the border. These are the qualities to test in the first order, because a supplier who is slow on a trial order will be slower at scale – and the signs are visible in how they answer the first technical question.
Read the same logic from the maintenance side: downtime reduction practices are mostly about having the right part, in the right condition, before the cast starts.
Making lead time a planning input
The most useful change is procedural: treat shipping time as a fixed input in the maintenance plan rather than a surprise. Publish the pipeline on the same calendar as the cast schedule, mark the point at which a reorder must be raised, and give the store a simple rule for when to escalate to air freight. Two or three scheduled shipments a year, sized to consumption, keep a cast house supplied without tying up capital – and without the emergency premium that a stockout always charges.
Frequently asked questions
How much stock should a plant hold?
Six to eight weeks of normal consumption, plus one spare string per drilling machine, plus a top-up before relines and blow-ins.
Is it cheaper to buy a full year at once?
Often for freight and unit price, rarely for flexibility. Two or three scheduled shipments usually beat both extremes.